Pages that link to "Item:Q2434291"
From MaRDI portal
The following pages link to On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time (Q2434291):
Displaying 8 items.
- Minmizing service span with batch-position-based learning effects (Q828675) (← links)
- Integrated production and outbound distribution scheduling problems with job release dates and deadlines (Q1617275) (← links)
- Online scheduling on a single machine with grouped processing times (Q1723520) (← links)
- Integrated Scheduling of Production and Two-Stage Delivery of Make-to-Order Products: Offline and Online Algorithms (Q5139609) (← links)
- An approximate dynamic programming approach for <scp>production‐delivery</scp> scheduling under non‐stationary demand (Q6051574) (← links)
- A review on integrated scheduling and outbound vehicle routing problems (Q6168583) (← links)
- Artificial intelligence application in production scheduling problem systematic literature review: bibliometric analysis, research trend, and knowledge taxonomy (Q6559485) (← links)
- An upper bound for the inter-exit time of two jobs in an \(m\)-machine flow shop (Q6588488) (← links)