Pages that link to "Item:Q2449345"
From MaRDI portal
The following pages link to Integrated production scheduling and distribution planning in dairy supply chain by hybrid modelling (Q2449345):
Displaying 8 items.
- Single-machine serial-batch delivery scheduling with two competing agents and due date assignment (Q829197) (← links)
- Supply chain batching problem with identical orders and lifespan (Q1666418) (← links)
- An MILP model for planning of batch plants operating in a campaign-mode (Q1686503) (← links)
- Two-stage medical supply chain scheduling with an assignable common due window and shelf life (Q1740417) (← links)
- Order release planning by iterative simulation and linear programming: theoretical foundation and analysis of its shortcomings (Q2273906) (← links)
- Planning and scheduling of the make-and-pack dairy production under lifetime uncertainty (Q2294752) (← links)
- The vehicle routing and scheduling problem with cross-docking for perishable products under uncertainty: two robust bi-objective models (Q2310621) (← links)
- A model for planning and optimizing an engineering company production (Q2656524) (← links)