Pages that link to "Item:Q2450684"
From MaRDI portal
The following pages link to Single machine scheduling with job-dependent convex cost and arbitrary precedence constraints (Q2450684):
Displaying 4 items.
- Exact and heuristic algorithms for minimizing tardy/lost penalties on a single-machine scheduling problem (Q725705) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- Dual Techniques for Scheduling on a Machine with Varying Speed (Q3174696) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)