Pages that link to "Item:Q2456478"
From MaRDI portal
The following pages link to A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness (Q2456478):
Displaying 19 items.
- Inventory based bi-objective flow shop scheduling model and its hybrid genetic algorithm (Q474788) (← links)
- A multi-population cooperative coevolutionary algorithm for multi-objective capacitated arc routing problem (Q506144) (← links)
- Generalized decomposition and cross entropy methods for many-objective optimization (Q507765) (← links)
- Hybrid flowshop scheduling with machine and resource-dependent processing times (Q534872) (← links)
- Notes on ``Some single-machine scheduling problems with general position-dependent and time-dependent learning effects'' (Q545340) (← links)
- Increasing selective pressure towards the best compromise in evolutionary multiobjective optimization: the extended NOSGA method (Q621628) (← links)
- A class of multi-objective expected value decision-making model with birandom coefficients and its application to flow shop scheduling problem (Q730912) (← links)
- Some single-machine and \(m\)-machine flowshop scheduling problems with learning considerations (Q845319) (← links)
- A novel differential evolution algorithm for bi-criteria no-wait flow shop scheduling problems (Q1010312) (← links)
- Some scheduling problems with sum-of-processing-times-based and job-position-based learning effects (Q1031693) (← links)
- Solving a bi-objective unrelated parallel batch processing machines scheduling problem: a comparison study (Q1651526) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- Pareto-optimal solution for multiple objective linear programming problems with fuzzy goals (Q1794505) (← links)
- No-wait two-stage flowshop problem with multi-task flexibility of the first machine (Q2054067) (← links)
- A hybrid metaheuristic for the prize-collecting single machine scheduling problem with sequence-dependent setup times (Q2270448) (← links)
- Evolutionary algorithms for multi-objective dual-resource constrained flexible job-shop scheduling problem (Q2329576) (← links)
- Some scheduling problems with general position-dependent and time-dependent learning effects (Q2390362) (← links)
- A hybrid multi-objective immune algorithm for a flow shop scheduling problem with bi-objectives: weighted mean completion time and weighted mean tardiness (Q2456478) (← links)
- Incorporating dynamism in traditional machine loading problem: an AI-based optimisation approach (Q3163274) (← links)