Pages that link to "Item:Q2456641"
From MaRDI portal
The following pages link to Single-machine scheduling with an availability constraint to minimize the weighted sum of the completion times (Q2456641):
Displaying 20 items.
- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance (Q337029) (← links)
- Lagrangian relaxation and column generation-based lower bounds for the \(\text{Pm},h_{j1}\parallel \sum w_iC_i\) scheduling problem (Q470933) (← links)
- Minimizing total completion time on a single machine with a flexible maintenance activity (Q613512) (← links)
- Minimizing the total completion time on a single machine with the learning effect and multiple availability constraints (Q727323) (← links)
- Approximation algorithms for the makespan minimization with positive tails on a single machine with a fixed non-availability interval (Q841595) (← links)
- Two simple constant ratio approximation algorithms for minimizing the total weighted completion time on a single machine with a fixed non-availability interval (Q1042105) (← links)
- Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates (Q1652182) (← links)
- A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach (Q1730479) (← links)
- Minimizing total earliness and tardiness for common due date single-machine scheduling with an unavailability interval (Q1793403) (← links)
- A classification of dynamic programming formulations for offline deterministic single-machine scheduling problems (Q2102995) (← links)
- Minimizing total weighted late work on a single-machine with non-availability intervals (Q2165284) (← links)
- Single-machine scheduling with maintenance activities and rejection (Q2218650) (← links)
- Single-machine scheduling with machine unavailability periods and resource dependent processing times (Q2242291) (← links)
- Single-machine common due date total earliness/tardiness scheduling with machine unavailability (Q2286433) (← links)
- Heuristics for the single machine weighted sum of completion times scheduling problem with periodic maintenance (Q2301137) (← links)
- Scheduling jobs and maintenance activities on parallel machines (Q2359536) (← links)
- Minimizing maximum earliness and number of tardy jobs in the single machine scheduling problem with availability constraint (Q2429001) (← links)
- Worst-case analysis of the WSPT and MWSPT rules for single machine scheduling with one planned setup period (Q2467254) (← links)
- A Survey on Approximation Algorithms for Scheduling with Machine Unavailability (Q3637311) (← links)
- Minimizing tardiness scheduling measures with generalized due-dates and a maintenance activity (Q6109346) (← links)