Pages that link to "Item:Q2459401"
From MaRDI portal
The following pages link to Minimizing makespan on an \(m\)-machine re-entrant flowshop (Q2459401):
Displaying 8 items.
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- Minimizing total tardiness in a two-machine re-entrant flowshop with sequence-dependent setup times (Q337017) (← links)
- Minimizing total completion time for re-entrant flow shop scheduling problems (Q650903) (← links)
- Optimal solutions for a dock assignment problem with trailer transportation (Q744629) (← links)
- Minimizing total tardiness on a two-machine re-entrant flowshop (Q1042154) (← links)
- Flow shops with reentry: reversibility properties and makespan optimal schedules (Q2282537) (← links)
- A patient flow scheduling problem in ophthalmology clinic solved by the hybrid EDA-VNS algorithm (Q2292161) (← links)
- Multi-objective reentrant hybrid flowshop scheduling with machines turning on and off control strategy using improved multi-verse optimizer algorithm (Q2298225) (← links)