Pages that link to "Item:Q2463495"
From MaRDI portal
The following pages link to Complexities and algorithms for synchronized scheduling of parallel machine assembly and air transportation in consumer electronics supply chain (Q2463495):
Displayed 8 items.
- Integrated production and distribution scheduling problems related with fixed delivery departure dates and number of late orders (Q257796) (← links)
- Integrated production and logistics planning: contract manufacturing and choice of air/surface transportation (Q319939) (← links)
- A heuristic approach to a single stage assembly problem with transportation allocation (Q387489) (← links)
- A modified Pareto genetic algorithm for multi-objective build-to-order supply chain planning with product assembly (Q994251) (← links)
- Synchronizing production and air transportation scheduling using mathematical programming models (Q2390001) (← links)
- Integrated production and distribution with fixed delivery departure dates (Q2450622) (← links)
- Parallel batch processing machines scheduling in cloud manufacturing for minimizing total service completion time (Q2676295) (← links)
- Risk Based Optimization of Electronics Manufacturing Supply Chains (Q3299237) (← links)