Pages that link to "Item:Q2467265"
From MaRDI portal
The following pages link to Balancing and scheduling tasks in assembly lines with sequence-dependent setup times (Q2467265):
Displaying 24 items.
- Systematic data generation and test design for solution algorithms on the example of SALBPGen for assembly line balancing (Q257213) (← links)
- New formulations for the setup assembly line balancing and scheduling problem (Q280181) (← links)
- A nonmonotone GRASP (Q340011) (← links)
- Balancing and scheduling of flexible mixed model assembly lines (Q481715) (← links)
- Bi-criteria assembly line balancing by considering flexible operation times (Q651766) (← links)
- Corrigendum to ``Balancing and scheduling tasks in assembly lines with sequence-dependent setup'' [European Journal of Operational Research 187 (2008) 1212-1223] (Q1044178) (← links)
- Minimizing the number of stations and station activation costs for a production line (Q1652155) (← links)
- Balancing a robotic spot welding manufacturing line: an industrial case study (Q1694852) (← links)
- Scheduling with time-dependent discrepancy times (Q1702735) (← links)
- Combinatorial Benders cuts for assembly line balancing problems with setups (Q1751843) (← links)
- The assembly line balancing and scheduling problem with sequence-dependent setup times: problem extension, model formulation and efficient heuristics (Q1936599) (← links)
- On the complexity of assembly line balancing problems (Q2003432) (← links)
- Assembly line balancing: what happened in the last fifteen years? (Q2140264) (← links)
- Enhanced multi-hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industry (Q2256345) (← links)
- An evaluation of constructive heuristic methods for solving the alternative subgraphs assembly line balancing problem (Q2271118) (← links)
- Metaheuristic algorithms for balancing robotic assembly lines with sequence-dependent robot setup times (Q2307078) (← links)
- A survey of the parallel assembly lines balancing problem (Q2664411) (← links)
- Balancing two-sided assembly lines with sequence-dependent setup times (Q3163182) (← links)
- Optimising and simulating the assembly line balancing problem in a motorcycle manufacturing company: a case study (Q3163278) (← links)
- Solving the Type-2 Assembly Line Balancing with Setups Using Logic-Based Benders Decomposition (Q5084654) (← links)
- Sequence-dependent time- and cost-oriented assembly line balancing problems: a combinatorial Benders’ decomposition approach (Q6048109) (← links)
- Robust decision trees for the multi-mode project scheduling problem with a resource investment objective and uncertain activity duration (Q6090155) (← links)
- Robust counterpart mathematical models for balancing, sequencing, and assignment of robotic U-shaped assembly lines with considering failures and setup times (Q6105933) (← links)
- Mathematical model and a variable neighborhood search algorithm for mixed-model robotic two-sided assembly line balancing problems with sequence-dependent setup times (Q6173783) (← links)