Pages that link to "Item:Q2486839"
From MaRDI portal
The following pages link to Yard crane scheduling in port container terminals (Q2486839):
Displayed 16 items.
- A reclaimer scheduling problem arising in coal stockyard management (Q341465) (← links)
- Yard crane scheduling for container storage, retrieval, and relocation (Q724093) (← links)
- Scheduling automated triple cross-over stacking cranes in a container yard (Q989636) (← links)
- Real-time scheduling for twin RMGs in an automated container yard (Q989643) (← links)
- Discrete time model and algorithms for container yard crane scheduling (Q1027603) (← links)
- A Benders decomposition-based framework for solving quay crane scheduling problems (Q1622801) (← links)
- Scheduling reclaimers serving a stock pad at a coal terminal (Q1707674) (← links)
- An improved discrete PSO for tugboat assignment problem under a hybrid scheduling rule in container terminal (Q1719017) (← links)
- Two-stage search algorithm for the inbound container unloading and stacking problem (Q1988734) (← links)
- A branch-and-price algorithm to solve the integrated berth allocation and yard assignment problem in bulk ports (Q2256282) (← links)
- Storage yard operations in container terminals: literature overview, trends, and research directions (Q2256283) (← links)
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals (Q2286432) (← links)
- Solving the single crane scheduling problem at rail transshipment yards (Q2422744) (← links)
- Operations research at container terminals: a literature update (Q2480797) (← links)
- Vehicle Routing Problems and Container Terminal Operations – An Update of Research (Q3564376) (← links)
- Models and algorithms for a yard crane scheduling problem in container ports (Q6167632) (← links)