Pages that link to "Item:Q2489138"
From MaRDI portal
The following pages link to A bicriterion approach to time/cost trade-offs in scheduling with convex resource-dependent job processing times and release dates (Q2489138):
Displaying 11 items.
- Scheduling with compressible and stochastic release dates (Q336364) (← links)
- Bicriteria scheduling problem for unrelated parallel machines with release dates (Q342063) (← links)
- Minimizing the number of late jobs for the permutation flowshop problem with secondary resources (Q941545) (← links)
- A bicriteria approach to minimize maximal lateness and resource consumption for scheduling a single machine (Q954246) (← links)
- Minimizing total tardiness on a single machine with controllable processing times (Q1000969) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- Resource cost aware scheduling (Q1750475) (← links)
- A survey of scheduling with controllable processing times (Q2381529) (← links)
- Bi-criteria and tri-criteria analysis to minimize maximum lateness makespan and resource consumption for scheduling a single machine (Q2434305) (← links)
- Single-machine group scheduling with deteriorating jobs and allotted resource (Q2448141) (← links)
- Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect (Q2954339) (← links)