Pages that link to "Item:Q2490218"
From MaRDI portal
The following pages link to A branch-and-bound algorithm for a single machine sequencing to minimize the sum of maximum earliness and tardiness with idle insert (Q2490218):
Displaying 4 items.
- Minimizing the weighted sum of maximum earliness and maximum tardiness costs on a single machine with periodic preventive maintenance (Q337029) (← links)
- Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system (Q856147) (← links)
- Multi-level lot sizing and job shop scheduling with compressible process times: a cutting plane approach (Q2356184) (← links)
- Single machine scheduling with unequal release times and idle insert for minimizing the sum of maximum earliness and tardiness (Q2450493) (← links)