Pages that link to "Item:Q2508124"
From MaRDI portal
The following pages link to An integrated approach for modeling and solving the scheduling problem of container handling systems (Q2508124):
Displaying 3 items.
- Machine scheduling in underground mining: an application in the potash industry (Q280169) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- A genetic algorithm for optimization of integrated scheduling of cranes, vehicles, and storage platforms at automated container terminals (Q2517476) (← links)