Pages that link to "Item:Q2519078"
From MaRDI portal
The following pages link to Minimizing the makespan in a two-machine cross-docking flow shop problem (Q2519078):
Displaying 22 items.
- Synchronization in cross-docking networks: a research classification and framework (Q297360) (← links)
- Exact algorithms for inventory constrained scheduling on a single machine (Q398845) (← links)
- Scheduling cross docking operations under full, partial and no information on inbound arrivals (Q622133) (← links)
- Set-based broadcast scheduling for minimizing the worst access time of multiple data items in wireless environments (Q712676) (← links)
- Part logistics in the automotive industry: decision problems, literature review and research agenda (Q726233) (← links)
- A mixed integer programming model for solving real-time truck-to-door assignment and scheduling problem at cross docking warehouse (Q747012) (← links)
- Approximation algorithms for inventory constrained scheduling on a single machine (Q906561) (← links)
- An integer programming approach to scheduling the transshipment of products at cross-docks in less-than-truckload industries (Q1652280) (← links)
- Truck synchronization at single door cross-docking terminals (Q1656428) (← links)
- A hybrid Lagrangian metaheuristic for the cross-docking flow shop scheduling problem (Q1711458) (← links)
- Automated sortation conveyors: a survey from an operational research perspective (Q1734332) (← links)
- A robust two-phase heuristic algorithm for the truck scheduling problem in a resource-constrained crossdock (Q1761198) (← links)
- Truck scheduling in cross-docking terminals with fixed outbound departures (Q1944875) (← links)
- Scheduling incoming and outgoing trucks at cross docking terminals to minimize the storage cost (Q1945098) (← links)
- A multiobjective mathematical model for truck scheduling problem in multidoor cross-docking system (Q2169336) (← links)
- A genetic algorithm to minimize the makespan in a two-machine cross-docking flow shop problem (Q2223269) (← links)
- Inbound and outbound flow integration for cross-docking operations (Q2240064) (← links)
- Dynamic multiobjective software project scheduling optimization method based on firework algorithm (Q2298859) (← links)
- Approximations for the two-machine cross-docking flow shop problem (Q2446855) (← links)
- Complexity of flow time minimization in a crossdock truck scheduling problem with asymmetric handover relations (Q2670471) (← links)
- Algorithms for minimizing the makespan in a two-machine cross-docking flow shop problem (Q3186840) (← links)
- A novel cross docking system for distributing the perishable products considering preemption: a machine learning approach (Q6166197) (← links)