Pages that link to "Item:Q2569066"
From MaRDI portal
The following pages link to Stability analysis of an optimal balance for an assembly line with fixed cycle time (Q2569066):
Displayed 23 items.
- Maximizing the robustness for simple assembly lines with fixed cycle time and limited number of workstations (Q284850) (← links)
- Second order conic approximation for disassembly line design with joint probabilistic constraints (Q320132) (← links)
- Robust scheduling of wireless sensor networks for target tracking under uncertainty (Q322906) (← links)
- A meta-heuristic algorithm for the fuzzy assembly line balancing type-E problem (Q336695) (← links)
- A decomposition based solution algorithm for U-type assembly line balancing with interval data (Q337547) (← links)
- Scheduling personal finances via integer programming (Q367243) (← links)
- Scenario based robust line balancing: Computational complexity (Q442208) (← links)
- Minimizing total weighted completion time with uncertain data: a stability approach (Q612208) (← links)
- Stability polyhedra of optimal permutation of jobs servicing (Q893928) (← links)
- The stability radius of an optimal line balance with maximum efficiency for a simple assembly line (Q1634287) (← links)
- The robust (minmax regret) assembly line worker assignment and balancing problem (Q1652575) (← links)
- Balancing of simple assembly lines under variations of task processing times (Q1945084) (← links)
- Quantitative stability analysis for vector problems of 0-1 programming (Q1952505) (← links)
- Optimization on production-inventory problem with multistage and varying demand (Q1952905) (← links)
- Robust balancing of transfer lines with blocks of uncertain parallel tasks under fixed cycle time and space restrictions (Q2029912) (← links)
- Solving robust bin-packing problems with a branch-and-price approach (Q2060393) (← links)
- Stability factor for robust balancing of simple assembly lines under uncertainty (Q2146745) (← links)
- Robust scheduling for target tracking using wireless sensor networks (Q2289953) (← links)
- A classification of assembly line balancing problems (Q2371356) (← links)
- Uncertainty measure for the Bellman-Johnson problem with interval processing times (Q2452733) (← links)
- A survey on problems and methods in generalized assembly line balancing (Q2569060) (← links)
- A multiple single-pass heuristic algorithm solving the stochastic assembly line rebalancing problem (Q3055647) (← links)
- Estimating the Stability Radius of an Optimal Solution to the Simple Assembly Line Balancing Problem (Q4973252) (← links)