Pages that link to "Item:Q2569085"
From MaRDI portal
The following pages link to Flexible flow shop scheduling with uniform parallel machines (Q2569085):
Displayed 4 items.
- Two hybrid meta-heuristics for the finite horizon ELSP in flexible flow lines with unrelated parallel machines (Q878937) (← links)
- A note on the two-stage assembly flow shop scheduling problem with uniform parallel machines (Q881563) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)