The following pages link to A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (Q2570161):
Displaying 47 items.
- Integration of electromagnetism with multi-objective evolutionary algorithms for RCPSP (Q322615) (← links)
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (Q322689) (← links)
- A filter-and-fan approach with adaptive neighborhood switching for resource-constrained project scheduling (Q342339) (← links)
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling (Q421082) (← links)
- Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers (Q421579) (← links)
- A neurogenetic approach for the resource-constrained project scheduling problem (Q709106) (← links)
- Experimental investigation of heuristics for resource-constrained project scheduling: an update (Q858327) (← links)
- Solving the resource-constrained project scheduling problem using filter-and-fan approach (Q945251) (← links)
- A random key based genetic algorithm for the resource constrained project scheduling problem (Q947946) (← links)
- NeuroGenetic approach for combinatorial optimization: an exploratory analysis (Q970182) (← links)
- An electromagnetism metaheuristic for the unicost set covering problem (Q976443) (← links)
- A hybrid of the restarted Arnoldi and electromagnetism meta-heuristic methods for calculating eigenvalues and eigenvectors of a non-symmetric matrix (Q990403) (← links)
- Solving the discrete time/resource trade-off problem in project scheduling with genetic algorithms (Q990459) (← links)
- A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem (Q1037664) (← links)
- An efficient genetic algorithm to solve the resource-constrained project scheduling problem with transfer times: the single mode case (Q1681264) (← links)
- The use of frontier techniques to identify efficient solutions for the berth allocation problem solved with a hybrid evolutionary algorithm (Q1738818) (← links)
- Towards merging binary integer programming techniques with genetic algorithms (Q1748518) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- An effective shuffled frog-leaping algorithm for resource-constrained project scheduling problem (Q1762055) (← links)
- Mode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problem (Q1992769) (← links)
- Revenue sharing for resource transfer among projects (Q2027026) (← links)
- A hybrid rank-based evolutionary algorithm applied to multi-mode resource-constrained project scheduling problem (Q2270291) (← links)
- Theoretical insights into the augmented-neural-network approach for combinatorial optimization (Q2271837) (← links)
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- Probability mechanism based particle swarm optimization algorithm and its application in resource-constrained project scheduling problems (Q2296600) (← links)
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (Q2355885) (← links)
- A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search (Q2383848) (← links)
- Genetic algorithm for the resource-constrained project scheduling problem (Q2401044) (← links)
- A hybrid genetic algorithm for the resource-constrained project scheduling problem (Q2455614) (← links)
- Solving the resource availability cost problem in project scheduling by path relinking and genetic algorithm (Q2479156) (← links)
- Augmenting priority rule heuristics with justification and rollout to solve the resource-constrained project scheduling problem (Q2482379) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A hybrid scatter search for the discrete time/resource trade-off problem in project scheduling (Q2519076) (← links)
- Scatter search --- wellsprings and challenges (Q2570140) (← links)
- Differential evolution algorithms using hybrid mutation (Q2643625) (← links)
- A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (Q3163363) (← links)
- Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art (Q3432703) (← links)
- Feasibility and Dominance Rules in the Electromagnetism-Like Algorithm for Constrained Global Optimization (Q3512539) (← links)
- Cooperative co‐evolutionary scatter search for satellite module layout design (Q4908059) (← links)
- A multi‐agent system for the decentralized resource‐constrained multi‐project scheduling problem (Q5438568) (← links)
- (Q5878630) (← links)
- A branch-and-bound algorithm for the unit-capacity resource constrained project scheduling problem with transfer times (Q6109310) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)
- A genetic algorithm with resource buffers for the resource-constrained multi-project scheduling problem (Q6554595) (← links)
- Reducing the feasible solution space of resource-constrained project instances (Q6561212) (← links)
- A genetic algorithm for the resource-constrained project scheduling problem with alternative subgraphs using a Boolean satisfiability solver (Q6565426) (← links)
- A branch-and-bound algorithm for the proactive resource-constrained project scheduling problem with a robustness maximization objective (Q6568412) (← links)