Pages that link to "Item:Q2654192"
From MaRDI portal
The following pages link to Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint (Q2654192):
Displaying 19 items.
- An economic production quantity model with non-synchronized screening and rework (Q272559) (← links)
- Using the EPQ for coordinated planning of a product with partial backordering and its components (Q534850) (← links)
- Economic production quantity model with repair failure and limited capacity (Q727263) (← links)
- A constrained integrated imperfect manufacturing-inventory system with preventive maintenance and partial backordering (Q1708531) (← links)
- Solving a finite horizon EPQ problem with backorders (Q1789475) (← links)
- Note on ``Multiproduct single-machine production system with stochastic scrapped production rate, partial backordering and service level constraint'' (Q2001793) (← links)
- Optimization of inventory system with defects, rework failure and two types of errors under crisp and fuzzy approach (Q2086914) (← links)
- Innovative maintenance problem in a two-stage production-inventory system with imperfect processes (Q2178315) (← links)
- A multiproduct single machine economic production quantity (EPQ) inventory model with discrete delivery order, joint production policy and budget constraints (Q2178350) (← links)
- GPSO-LS algorithm for a multi-item EPQ model with production capacity restriction (Q2282381) (← links)
- A comparative study of production-inventory model for determining effective production quantity and safety stock level (Q2285340) (← links)
- Determining optimal price, replenishment lot size and number of shipments for an EPQ model with rework and multiple shipments (Q2351267) (← links)
- Stochastic machine breakdown and discrete delivery in an imperfect inventory-production system (Q2397594) (← links)
- Determining an optimal replenishment run time and lot size for an imperfect manufacturing system and rework under markdown policy (Q2419093) (← links)
- Controllable lead time, service level constraint, and transportation discounts in a continuous review inventory model (Q2954361) (← links)
- Elastic Geometric Shape Matching for Point Sets under Translations (Q3449855) (← links)
- Optimal and simple algorithms to solve integrated procurement-production-inventory problem without/with shortage (Q4611479) (← links)
- Joint replenishment policy with backordering and special sale (Q5252906) (← links)
- An EPQ model for a single-machine multiproduct imperfect production system using a hybrid logarithmic barrier method (Q6059874) (← links)