Pages that link to "Item:Q2664358"
From MaRDI portal
The following pages link to Real-time production scheduling in the Industry-4.0 context: addressing uncertainties in job arrivals and machine breakdowns (Q2664358):
Displaying 12 items.
- The reversible temporal process language (Q2165209) (← links)
- A hybrid multi-objective approach for real-time flexible production scheduling and rescheduling under dynamic environment in Industry 4.0 context (Q2668716) (← links)
- An algorithm selection approach for the flexible job shop scheduling problem: choosing constraint programming solvers through machine learning (Q2672113) (← links)
- An uncertain permutation flow shop predictive scheduling problem with processing interruption (Q2683283) (← links)
- An improved hybrid metaheuristics and rule-based approach for flexible job-shop scheduling subject to machine breakdowns (Q6048632) (← links)
- Shop scheduling in manufacturing environments: a review (Q6060656) (← links)
- Maximizing the service level on the makespan in the stochastic flexible job-shop scheduling problem (Q6106559) (← links)
- Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry (Q6109347) (← links)
- revTPL: The Reversible Temporal Process Language (Q6151560) (← links)
- Exact and metaheuristic approaches to solve the integrated production scheduling, berth allocation and storage yard allocation problem (Q6164375) (← links)
- Real-time production scheduling using a deep reinforcement learning-based multi-agent approach (Q6557734) (← links)
- Enhancing stability and robustness in online machine shop scheduling: a multi-agent system and negotiation-based approach for handling machine downtime in industry 4.0 (Q6565395) (← links)