Pages that link to "Item:Q2668778"
From MaRDI portal
The following pages link to Scheduling with competing agents, total late work and job rejection (Q2668778):
Displaying 4 items.
- Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works (Q2083387) (← links)
- Bicriterion Pareto‐scheduling of equal‐length jobs on a single machine related to the total weighted late work (Q6057022) (← links)
- Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work (Q6077487) (← links)
- Two-agent single-machine scheduling with a rate-modifying activity (Q6087481) (← links)