Pages that link to "Item:Q2669504"
From MaRDI portal
The following pages link to Genetic programming-based hyper-heuristic approach for solving dynamic job shop scheduling problem with extended technical precedence constraints (Q2669504):
Displaying 3 items.
- Selection hyper-heuristics for the multi and many-objective quadratic assignment problem (Q2676362) (← links)
- Mathematical modelling and heuristic approaches to job-shop scheduling problem with conveyor-based continuous flow transporters (Q2676401) (← links)
- Dynamic shop-floor scheduling using real-time information: a case study from the thermoplastic industry (Q6109347) (← links)