Pages that link to "Item:Q2770115"
From MaRDI portal
The following pages link to Stochastic Scheduling on Parallel Machines Subject to Random Breakdowns to Minimize Expected Costs for Earliness and Tardy Jobs (Q2770115):
Displayed 8 items.
- Single machine stochastic JIT scheduling problem subject to machine breakdowns (Q931488) (← links)
- An approach to solve the minimum expected makespan flow-shop problem subject to breakdowns (Q1598772) (← links)
- Single machine scheduling to minimize total weighted earliness subject to minimal number of tardy jobs (Q2378377) (← links)
- Stochastic single machine scheduling subject to machines breakdowns with quadratic early-tardy penalties for the preemptive-repeat model (Q2471329) (← links)
- A heuristic approach to minimize expected makespan in open shops subject to stochastic processing times and failures (Q2475628) (← links)
- An empirical study of policies to integrate reactive scheduling and control in just-in-time job shop environments (Q4474722) (← links)
- An empirical study of policies to integrate reactive scheduling and control in just-in-time job shop environments (Q4823493) (← links)
- Stochastic single machine scheduling with an exponentially distributed due date (Q5945390) (← links)