The following pages link to (Q2784174):
Displaying 5 items.
- Makespan minimization in a no-wait flow shop problem with two batching machines (Q856680) (← links)
- Minimizing makespan for multi-spindle head machines with a mobile table (Q954031) (← links)
- Flowshop scheduling problem with a batching machine and task compatibilities (Q954038) (← links)
- Scheduling hybrid flowshop with parallel batching machines and compatibilities (Q1000991) (← links)
- Integrated problem of soaking pit heating and hot rolling scheduling in steel plants (Q2003439) (← links)