Pages that link to "Item:Q282236"
From MaRDI portal
The following pages link to An exact algorithm for an integrated project staffing problem with a homogeneous workforce (Q282236):
Displaying 8 items.
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals (Q1753439) (← links)
- On the complexity of assembly line balancing problems (Q2003432) (← links)
- A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing (Q2027048) (← links)
- The bilevel optimisation of a multi-agent project scheduling and staffing problem (Q2239938) (← links)
- A graph-based formulation for the shift rostering problem (Q2301967) (← links)
- A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems (Q2327625) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)