Pages that link to "Item:Q2892125"
From MaRDI portal
The following pages link to The quay crane scheduling problem with time windows (Q2892125):
Displaying 14 items.
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminals (Q319438) (← links)
- A Lagrangian relaxation-based heuristic for the multi-ship quay crane scheduling problem with ship stability constraints (Q513546) (← links)
- A local branching-based algorithm for the quay crane scheduling problem under unidirectional schedules (Q742501) (← links)
- Exact methods for the quay crane scheduling problem when tasks are modeled at the single container level (Q1654372) (← links)
- A generalized classification scheme for crane scheduling with interference (Q1698922) (← links)
- The study of the unidirectional quay crane scheduling problem: complexity and risk-aversion (Q1753475) (← links)
- Modeling and solving rich quay crane scheduling problems (Q1761126) (← links)
- Combining mixed integer programming and constraint programming to solve the integrated scheduling problem of container handling operations of a single vessel (Q2184047) (← links)
- An effective mathematical formulation for the unidirectional cluster-based quay crane scheduling problem (Q2255903) (← links)
- Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading (Q2293995) (← links)
- Dynamic programming algorithms for the general quay crane double-cycling problem with internal-reshuffles (Q2307494) (← links)
- A Lagrangian relaxation approach for solving the integrated quay crane assignment and scheduling problem (Q2337546) (← links)
- A joint quay crane assignment and scheduling problem: formulation, solution algorithm and computational results (Q2341106) (← links)
- Scheduling quay cranes and shuttle vehicles simultaneously with limited apron buffer capacity (Q6109309) (← links)