Pages that link to "Item:Q2893339"
From MaRDI portal
The following pages link to A polarized adaptive schedule generation scheme for the resource-constrained project scheduling problem (Q2893339):
Displaying 3 items.
- A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (Q2273894) (← links)
- A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (Q2355885) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)