Pages that link to "Item:Q296709"
From MaRDI portal
The following pages link to Coordination of production and interstage batch delivery with outsourced distribution (Q296709):
Displaying 11 items.
- On-line supply chain scheduling for single-machine and parallel-machine configurations with a single customer: minimizing the makespan and delivery cost (Q319441) (← links)
- Integrated production and delivery on parallel batching machines (Q320081) (← links)
- Complexity results for an integrated single machine scheduling and outbound delivery problem with fixed sequence (Q1702665) (← links)
- Just-in-time logistics for far-distant suppliers: scheduling truck departures from an intermediate cross-docking terminal (Q1703454) (← links)
- Integrated supply chain scheduling of procurement, production, and distribution under spillover effects (Q2026962) (← links)
- New exact and approximation algorithms for integrated production and transportation scheduling with committed delivery due dates and order acceptance (Q2106722) (← links)
- Supply chain scheduling in a collaborative manufacturing mode: model construction and algorithm design (Q2327696) (← links)
- Two faster algorithms for coordination of production and batch delivery: a note (Q2629739) (← links)
- Two heuristic methods based on decomposition to the integrated multi-agent supply chain scheduling and distribution problem (Q5038175) (← links)
- An approximate dynamic programming approach for <scp>production‐delivery</scp> scheduling under non‐stationary demand (Q6051574) (← links)
- Single machine scheduling with assignable due dates to minimize maximum and total late work (Q6167395) (← links)