Pages that link to "Item:Q296973"
From MaRDI portal
The following pages link to An automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problem (Q296973):
Displaying 13 items.
- Optimizing resource-constrained project scheduling problem considering the reliability function (Q2163632) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Machine learning at the service of meta-heuristics for solving combinatorial optimization problems: a state-of-the-art (Q2242290) (← links)
- An algorithm selection approach for the flexible job shop scheduling problem: choosing constraint programming solvers through machine learning (Q2672113) (← links)
- A modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splitting (Q2798120) (← links)
- On the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environment (Q4978242) (← links)
- A column-generation-based algorithm for a resource-constrained project scheduling problem with a fractional shared resource (Q5059351) (← links)
- Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms (Q5143361) (← links)
- An innovative four-layer heuristic for scheduling multi-mode projects under multiple resource constrains (Q5244304) (← links)
- Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (Q6088236) (← links)
- A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem (Q6106485) (← links)
- A data-driven \textit{meta}-learning recommendation model for multi-mode resource constrained project scheduling problem (Q6106590) (← links)
- On the summary measures for the resource-constrained project scheduling problem (Q6581387) (← links)