Pages that link to "Item:Q299837"
From MaRDI portal
The following pages link to Complexity results for the linear time-cost tradeoff problem with multiple milestones and completely ordered jobs (Q299837):
Displaying 9 items.
- A continuous time-cost tradeoff problem with multiple milestones and completely ordered jobs (Q319449) (← links)
- Simplifying the nonlinear continuous time-cost tradeoff problem (Q1697748) (← links)
- Multimode time-cost-robustness trade-off project scheduling problem under uncertainty (Q2156293) (← links)
- Scheduling two projects with controllable processing times in a single-machine environment (Q2215194) (← links)
- A linear time-cost tradeoff problem with multiple milestones under a comb graph (Q2424814) (← links)
- Min-Max Regret Version of the Linear Time–Cost Tradeoff Problem with Multiple Milestones and Completely Ordered Jobs (Q3455883) (← links)
- A Time–Cost Tradeoff Problem with Multiple Assessments and Release Times on a Chain Precedence Graph (Q5024918) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- Single-machine scheduling of multiple projects with controllable processing times (Q6167669) (← links)