Pages that link to "Item:Q3032046"
From MaRDI portal
The following pages link to Computing the probability distribution of project duration in a PERT network (Q3032046):
Displaying 11 items.
- A heuristic for optimizing stochastic activity networks with applications to statistical digital circuit sizing (Q833427) (← links)
- An optimization model for stochastic project networks with cash flows (Q867428) (← links)
- Evaluating project completion time in project networks with discrete random activity durations (Q1017440) (← links)
- A factoring approach for the stochastic shortest path problem (Q1180841) (← links)
- Bounding the distribution of project duration in PERT networks (Q1200756) (← links)
- Resource-constrained project scheduling: Notation, classification, models, and methods (Q1806880) (← links)
- Stochastic task networks -- trading performance for stability (Q2011606) (← links)
- A new approximation algorithm for obtaining the probability distribution function for project completion time (Q2460585) (← links)
- Global optima results for the Kauffman \(NK\) model (Q2490339) (← links)
- The exact overall time distribution of a project with uncertain task durations (Q5928451) (← links)
- Network reliability: Heading out on the highway (Q6087070) (← links)