Pages that link to "Item:Q3055285"
From MaRDI portal
The following pages link to New heuristics for no-wait flow shops with a linear combination of makespan and maximum lateness (Q3055285):
Displayed 6 items.
- Total completion time with makespan constraint in no-wait flowshops with setup times (Q296867) (← links)
- Accelerated tabu search for no-wait flowshop scheduling problem with maximum lateness criterion (Q976399) (← links)
- No-wait flowshop scheduling problem with two criteria; total tardiness and makespan (Q1750472) (← links)
- A survey of scheduling problems with no-wait in process (Q1751258) (← links)
- No-wait flowshop scheduling problem with separate setup times to minimize total tardiness subject to makespan (Q2284308) (← links)
- A novel iterated greedy algorithm for no-wait permutation flowshop scheduling to minimize weighted quadratic tardiness (Q6193912) (← links)