Pages that link to "Item:Q3159686"
From MaRDI portal
The following pages link to Optimal versus heuristic scheduling of surface mount technology lines (Q3159686):
Displaying 4 items.
- A lexicographic approach to bi-objective scheduling of single-period orders in make-to-order manufacturing (Q872122) (← links)
- A memetic algorithm for the flexible flow line scheduling problem with processor blocking (Q954039) (← links)
- The hybrid flow shop scheduling problem (Q2270289) (← links)
- A multi‐objective customer orders assignment and resource leveling in make‐to‐order manufacturing (Q5438563) (← links)