Pages that link to "Item:Q3163363"
From MaRDI portal
The following pages link to A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (Q3163363):
Displaying 10 items.
- Temporal linear relaxation in IBM ILOG CP optimizer (Q309055) (← links)
- Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars (Q322689) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- Generic negotiation mechanisms with side payments -- design, analysis and application for decentralized resource-constrained multi-project scheduling problems (Q1753651) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Going to the core of hard resource-constrained project scheduling instances (Q2664304) (← links)
- An analysis of network and resource indicators for resource-constrained project scheduling problem instances (Q2668709) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)
- Reducing the feasible solution space of resource-constrained project instances (Q6561212) (← links)