Pages that link to "Item:Q3163716"
From MaRDI portal
The following pages link to Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times (Q3163716):
Displaying 10 items.
- Ant colony systems for the single-machine total weighted earliness tardiness scheduling problem (Q282252) (← links)
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Optimizing of bullwhip effect and net stock amplification in three-echelon supply chains using evolutionary multi-objective metaheuristics (Q324324) (← links)
- Bi-objective integrating sustainable order allocation and sustainable supply chain network strategic design with stochastic demand using a novel robust hybrid multi-objective metaheuristic (Q337636) (← links)
- A binary multiple knapsack model for single machine scheduling with machine unavailability (Q342369) (← links)
- Project scheduling heuristics-based standard PSO for task-resource assignment in heterogeneous grid (Q535971) (← links)
- Iterated search methods for earliness and tardiness minimization in hybrid flowshops with due windows (Q1652188) (← links)
- Heuristic and exact algorithms for the two-machine just in time job shop scheduling problem (Q1793464) (← links)
- A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation (Q1998264) (← links)
- A parameter-less iterated greedy method for the hybrid flowshop scheduling problem with setup times and due date windows (Q2673560) (← links)