Pages that link to "Item:Q3166685"
From MaRDI portal
The following pages link to An efficient metaheuristic for integrated scheduling and staffing IT projects based on a generalized minimum cost flow network (Q3166685):
Displaying 11 items.
- A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints (Q1628053) (← links)
- Minimizing average project team size given multi-skilled workers with heterogeneous skill levels (Q1651635) (← links)
- A column generation approach for the integrated shift and task scheduling problem of logistics assistants in hospitals (Q1753439) (← links)
- Metaheuristic search techniques for multi-objective and stochastic problems: a history of the inventions of Walter J. Gutjahr in the past 22 years (Q1787914) (← links)
- A new algorithm for resource-constrained project scheduling with breadth and depth of skills (Q2030541) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- A resource type analysis of the integrated project scheduling and personnel staffing problem (Q2398432) (← links)
- Multi-project scheduling problem under shared multi-skill resource constraints (Q2701180) (← links)
- Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption (Q6056166) (← links)
- A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem (Q6106961) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)