Pages that link to "Item:Q319777"
From MaRDI portal
The following pages link to Scheduling resource-constrained projects with a flexible project structure (Q319777):
Displaying 9 items.
- Maximising the weighted number of activity execution modes in project planning (Q724006) (← links)
- A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs (Q1631504) (← links)
- An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185) (← links)
- Stochastic project scheduling with hierarchical alternatives (Q2295321) (← links)
- Evolutionary algorithms for multi-objective stochastic resource availability cost problem (Q2656542) (← links)
- Preemptive multi-skilled resource constrained project scheduling problem with hard/soft interval due dates (Q5214337) (← links)
- Hybrid differential evolution algorithm for the resource constrained project scheduling problem with a flexible project structure and consumption and production of resources (Q6087528) (← links)
- Resource leveling in projects with flexible structures (Q6099408) (← links)
- A genetic algorithm for the resource-constrained project scheduling problem with alternative subgraphs using a Boolean satisfiability solver (Q6565426) (← links)