Pages that link to "Item:Q331763"
From MaRDI portal
The following pages link to Capacitated lot sizing with parallel machines, sequence-dependent setups, and a common setup operator (Q331763):
Displaying 11 items.
- Simultaneous lotsizing and scheduling considering secondary resources: a general model, literature review and classification (Q1733088) (← links)
- Classifying and modeling setups and cleanings in lot sizing and scheduling (Q1753633) (← links)
- Alternative mathematical models and solution approaches for lot-sizing and scheduling problems in the brewery industry: analyzing two different situations (Q1993026) (← links)
- A survey of job shop scheduling problem: the types and models (Q2146994) (← links)
- A capacitated lot-sizing model with sequence-dependent setups, parallel machines and bi-part injection moulding (Q2240342) (← links)
- Editorial. Quantitative approaches in production management (Q2302441) (← links)
- Worst case analysis of relax and fix heuristics for lot-sizing problems (Q2312339) (← links)
- Simultaneous lotsizing and scheduling problems: a classification and review of models (Q2362236) (← links)
- A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry (Q6048625) (← links)
- A sustainable inventory model to study the mixing and bottling plant of single item for cost minimization (Q6063789) (← links)
- A dynamic programming approach for the two-product capacitated lot-sizing problem with concave costs (Q6106968) (← links)