The following pages link to Cooperative twin-crane scheduling (Q335329):
Displaying 11 items.
- Scheduling cooperative gantry cranes with seaside and landside jobs (Q1744241) (← links)
- An exact solution approach for scheduling cooperative gantry cranes (Q1991263) (← links)
- Routing two stacking cranes with predetermined container sequences (Q2059087) (← links)
- Twin-crane scheduling during seaside workload peaks with a dedicated handshake area (Q2124909) (← links)
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals (Q2286432) (← links)
- Approximation algorithms for the twin robot scheduling problem (Q2305018) (← links)
- Pallet location and job scheduling in a twin-robot system (Q2676351) (← links)
- Exact duality transformations for sigma models and gauge theories (Q4833041) (← links)
- A geometric renormalization group in discrete quantum space–time (Q4833199) (← links)
- Optimizing the number of deployed yard cranes in a container terminal (Q5883816) (← links)
- Scheduling ASC and AGV considering direct, buffer, and hybrid modes for transferring containers (Q6065608) (← links)