Pages that link to "Item:Q336540"
From MaRDI portal
The following pages link to A constraint-based approach for the shift design personnel task scheduling problem with equity (Q336540):
Displaying 6 items.
- A constraint-based approach for the shift design personnel task scheduling problem with equity (Q336540) (← links)
- Heuristic decomposition approaches for an integrated task scheduling and personnel rostering problem (Q342548) (← links)
- Improved quantum genetic algorithm in application of scheduling engineering personnel (Q1722233) (← links)
- Solving the general employee scheduling problem (Q2333146) (← links)
- Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency (Q2988474) (← links)
- A shift-based model to solve the integrated staff rostering and task assignment problem with real-world requirements (Q6113339) (← links)