Pages that link to "Item:Q337056"
From MaRDI portal
The following pages link to Scheduling multiple factory cranes on a common track (Q337056):
Displaying 5 items.
- Cooperative twin-crane scheduling (Q335329) (← links)
- Sequencing dual-spreader crane operations: mathematical formulation and heuristic algorithm (Q1683073) (← links)
- A generalized classification scheme for crane scheduling with interference (Q1698922) (← links)
- A decomposition-based approach to the scheduling of identical automated yard cranes at container terminals (Q2286432) (← links)
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows (Q5058816) (← links)