Pages that link to "Item:Q337088"
From MaRDI portal
The following pages link to Two-phase branch and bound algorithm for robotic cells rescheduling considering limited disturbance (Q337088):
Displaying 5 items.
- Rescheduling on identical parallel machines with machine disruptions to minimize total completion time (Q322965) (← links)
- An efficient new heuristic for the hoist scheduling problem (Q342278) (← links)
- A dynamic scheduling approach for optimizing the material handling operations in a robotic cell (Q1654361) (← links)
- Multi-machine scheduling with interval constrained position-dependent processing times (Q1716992) (← links)
- An efficient bicriteria algorithm for stable robotic flow shop scheduling (Q1753515) (← links)