Pages that link to "Item:Q339552"
From MaRDI portal
The following pages link to Scheduling problems with two competing agents to minimized weighted earliness-tardiness (Q339552):
Displaying 5 items.
- A tabu method for a two-agent single-machine scheduling with deterioration jobs (Q336450) (← links)
- Two-agent parallel-machine scheduling with rejection (Q1676363) (← links)
- A two-agent single-machine scheduling problem to minimize the total cost with release dates (Q1701559) (← links)
- A two-agent single-machine scheduling problem with late work criteria (Q1701708) (← links)
- Two-agent-based single-machine scheduling with switchover time to minimize total weighted completion time and makespan objectives (Q1730482) (← links)