Pages that link to "Item:Q342481"
From MaRDI portal
The following pages link to New simple constructive heuristic algorithms for minimizing total flow-time in the permutation flowshop scheduling problem (Q342481):
Displaying 7 items.
- A beam-search-based constructive heuristic for the PFSP to minimise total flowtime (Q1652234) (← links)
- Enhanced migrating birds optimization algorithm for the permutation flow shop problem with sequence dependent setup times (Q1694317) (← links)
- Synergy of genetic algorithm with extensive neighborhood search for the permutation flowshop scheduling problem (Q1992647) (← links)
- Scheduling blocking flowshops with setup times via constraint guided and accelerated local search (Q2003564) (← links)
- Optimization of stability of humanoid robot NAO using ant colony optimization tuned MPC controller for uneven path (Q2099930) (← links)
- Automatic design of constructive heuristics for a reconfigurable distributed flowshop group scheduling problem (Q6065623) (← links)
- A simheuristic algorithm for the stochastic permutation flow‐shop problem with delivery dates and cumulative payoffs (Q6070118) (← links)