Pages that link to "Item:Q3502863"
From MaRDI portal
The following pages link to RESCHEDULING WITH RELEASE DATES TO MINIMIZE TOTAL SEQUENCE DISRUPTION UNDER A LIMIT ON THE MAKESPAN (Q3502863):
Displayed 5 items.
- Rescheduling with new orders and general maximum allowable time disruptions (Q330107) (← links)
- A common framework and taxonomy for multicriteria scheduling problems with interfering and competing jobs: multi-agent scheduling problems (Q2256205) (← links)
- Pareto optimization of rescheduling with release dates to minimize makespan and total sequence disruption (Q2434315) (← links)
- Single-machine rescheduling with deterioration and learning effects against the maximum sequence disruption (Q2792200) (← links)
- Rescheduling to Minimize the Maximum Lateness Under the Sequence Disruptions of Original Jobs (Q4595325) (← links)