Pages that link to "Item:Q3518511"
From MaRDI portal
The following pages link to Multiple colony ant algorithm for job-shop scheduling problem (Q3518511):
Displaying 4 items.
- An effective new island model genetic algorithm for job shop scheduling problem (Q342266) (← links)
- Parallel-identical-machine job-shop scheduling with different stage-dependent buffering requirements (Q342448) (← links)
- Bi-level multi-objective mathematical model for job-shop scheduling: the application of Theory of Constraints (Q3163158) (← links)
- Ant colony optimisation with parameterised search space for the job shop scheduling problem (Q3163736) (← links)