Pages that link to "Item:Q3521606"
From MaRDI portal
The following pages link to SINGLE MACHINE SCHEDULING WITH JOB DELIVERY TO MINIMIZE MAKESPAN (Q3521606):
Displaying 12 items.
- Machine scheduling with a maintenance interval and job delivery coordination (Q518131) (← links)
- Single machine scheduling with job delivery to multiple customers (Q1617286) (← links)
- Unrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness (Q2108098) (← links)
- Improved approximation algorithm for scheduling on a serial batch machine with split-allowed delivery (Q2176828) (← links)
- Integrated production and delivery scheduling on a serial batch machine to minimize the makespan (Q2257290) (← links)
- Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time (Q2342682) (← links)
- On-line integrated production and outbound distribution scheduling to minimize the maximum delivery completion time (Q2434291) (← links)
- A SINGLE-MACHINE DETERIORATING JOB SCHEDULING PROBLEM WITH A NON-REGULAR CRITERION (Q3013563) (← links)
- Machine Scheduling with a Maintenance Interval and Job Delivery Coordination (Q3452556) (← links)
- PARALLEL MACHINE SCHEDULING WITH JOB DELIVERY COORDINATION (Q5370785) (← links)
- Two-stage scheduling on identical machines with assignable delivery times to minimize the maximum delivery completion time (Q5964074) (← links)
- Flow shop scheduling problems with transportation constraints revisited (Q6185848) (← links)