Pages that link to "Item:Q3585727"
From MaRDI portal
The following pages link to Single machine scheduling with sequence-dependent family setups to minimize maximum lateness (Q3585727):
Displayed 6 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Exact and heuristic procedures for single machine scheduling with quadratic earliness and tardiness penalties (Q336376) (← links)
- ILS heuristics for the single-machine scheduling problem with sequence-dependent family setup times to minimize total tardiness (Q670296) (← links)
- Optimal control strategies for single-machine family scheduling with sequence-dependent batch setup and controllable processing times (Q892912) (← links)
- A novel integer programing formulation for scheduling with family setup times on a single machine to minimize maximum lateness (Q1683059) (← links)
- The single machine weighted mean squared deviation problem (Q1753598) (← links)