Pages that link to "Item:Q363556"
From MaRDI portal
The following pages link to Flow shop scheduling with peak power consumption constraints (Q363556):
Displaying 14 items.
- Scheduling on a single machine under time-of-use electricity tariffs (Q271939) (← links)
- Energy-efficient scheduling in manufacturing companies: a review and research framework (Q320771) (← links)
- Carbon-efficient scheduling of flow shops by multi-objective optimization (Q320773) (← links)
- Energy-efficient bi-objective single-machine scheduling with power-down mechanism (Q1652365) (← links)
- A multi-objective differential evolution algorithm for parallel batch processing machine scheduling considering electricity consumption cost (Q1652653) (← links)
- Flow shop for dual CPUs in dynamic voltage scaling (Q1986559) (← links)
- A bi-objective heuristic approach for green identical parallel machine scheduling (Q2029023) (← links)
- Exact method to optimize the total electricity cost in two-machine permutation flow shop scheduling problem under time-of-use tariff (Q2147073) (← links)
- Matheuristics for the flowshop scheduling problem with controllable processing times and limited resource consumption to minimize total tardiness (Q2147170) (← links)
- Minimizing the total tardiness and the total carbon emissions in the permutation flow shop scheduling problem (Q2669708) (← links)
- Flow Shop for Dual CPUs in Dynamic Voltage Scaling (Q2817894) (← links)
- Improved mixed-integer linear programming model and heuristics for bi-objective single-machine batch scheduling with energy cost consideration (Q5058887) (← links)
- Bi-objective speed-scaling robotic cell scheduling with peak power consumption constraint (Q6133185) (← links)
- Optimising makespan and energy consumption in task scheduling for parallel systems (Q6164588) (← links)