Pages that link to "Item:Q3637411"
From MaRDI portal
The following pages link to Scheduling Multiple Parts in a Robotic Cell Served by a Dual-Gripper Robot (Q3637411):
Displayed 12 items.
- Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells (Q706905) (← links)
- Scheduling dual gripper robotic cell: one-unit cycles (Q817550) (← links)
- A note on productivity gains in flexible robotic cells (Q853749) (← links)
- Sequencing and scheduling in robotic cells: recent developments (Q880509) (← links)
- Throughput optimization in robotic cells with input and output machine buffers: a comparative study of two key models (Q976500) (← links)
- Parallel machine scheduling with multiple unloading servers (Q983625) (← links)
- Cyclic scheduling of parts and robot moves in \(m\)-machine robotic cells (Q1652519) (← links)
- MIP models and hybrid algorithm for minimizing the makespan of parallel machines scheduling problem with a single server (Q1761182) (← links)
- A review of TSP based approaches for flowshop scheduling (Q2572854) (← links)
- Optimal cyclic scheduling of a hoist and multi-type parts with fixed processing times (Q3163706) (← links)
- Transporting jobs through a two‐machine open shop (Q3621908) (← links)
- SOME UNDERLYING MATHEMATICAL DEFINITIONS AND PRINCIPLES FOR CELLULAR MANUFACTURING (Q5411734) (← links)