Pages that link to "Item:Q4006241"
From MaRDI portal
The following pages link to Economic manufacturing quantity in a just-in-time delivery system (Q4006241):
Displayed 13 items.
- Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments (Q409873) (← links)
- Supply chain models for an assembly system with preprocessing of raw materials (Q877051) (← links)
- Optimal production plans and shipment schedules in a supply-chain system with multiple suppliers and multiple buyers (Q958558) (← links)
- Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system (Q1266737) (← links)
- Operations planning for a multi-stage kanban system (Q1806912) (← links)
- An integrated inventory model with variable transportation cost, two-stage inspection, and defective items (Q2411174) (← links)
- Optimisation of traceability and operations planning: an integrated model for perishable food production (Q3055443) (← links)
- Mathematical modelling for determining economic batch size and optimal number of deliveries for EPQ model with quality assurance (Q3072346) (← links)
- Numerical method for determination of the optimal lot size for a manufacturing system with discontinuous issuing policy and rework (Q3107242) (← links)
- Manufacturing lot-sizing, procurement and delivery schedules over a finite planning horizon (Q3163277) (← links)
- Effects of kanban withdrawal policies and other factors on the performance of JIT systems—a simulation study (Q4230276) (← links)
- An optimal batch size for an imperfect production system with quality assurance and rework (Q5444507) (← links)
- An alternative approach to computing economic run quantity (Q5444643) (← links)