Pages that link to "Item:Q4126042"
From MaRDI portal
The following pages link to Scheduling a Project to Maximize Its Present Value: A Zero-One Programming Approach (Q4126042):
Displayed 38 items.
- Some efficient multi-heuristic procedures for resource-constrained project scheduling (Q721676) (← links)
- Project bidding under deterministic and probabilistic activity durations (Q721677) (← links)
- The scheduling of activities to maximize the net present value of projects (Q721678) (← links)
- Computational experience with a backtracking algorithm for solving a general class of precedence and resource-constrained scheduling problems (Q721682) (← links)
- Resource constrained project scheduling: Modelling with multiple alternatives (Q806799) (← links)
- A genetic algorithm for resource investment problem with discounted cash flows (Q865553) (← links)
- An optimization model for stochastic project networks with cash flows (Q867428) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (Q1025246) (← links)
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties (Q1036260) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- A comparison of stochastic scheduling rules for maximizing project net present value (Q1127130) (← links)
- A time indexed formulation of non-preemptive single machine scheduling problems (Q1196724) (← links)
- Resource constrained project scheduling with multiple objectives: a decision support approach (Q1202275) (← links)
- An optimal procedure for the resource-constrained project scheduling problem with discounted cash flows and generalized precedence relations (Q1265850) (← links)
- A framework for an interactive project scheduling system under limited resources (Q1266550) (← links)
- Project network models with discounted cash flows a guided tour through recent developments (Q1278075) (← links)
- Scheduling projects to maximize net present value -- the case of time-dependent, contingent cash flows (Q1278462) (← links)
- Constrained multi-project planning problems: A Lagrangean decomposition approach (Q1342015) (← links)
- A tabu search procedure for the resource constrained project scheduling problem with discounted cash flows (Q1342100) (← links)
- A flexible heuristic for a multi-mode capital constrained project scheduling problem with probabilistic cash inflows (Q1373161) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- Capital- and resource-constrained project scheduling with net present value optimization (Q1752257) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Progress payments in project scheduling problems. (Q1812008) (← links)
- Solving the resource constrained project scheduling problem with optimization subroutine library (Q1919788) (← links)
- The project scheduling problem with irregular starting time costs (Q1969764) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- On scheduling credited projects (Q2261744) (← links)
- Kapazitätsplanung in Netzwerken. Ein Überblick über neuere Modelle und Verfahren. (Resource-constrained project planning in networks. A survey on new models and methods) (Q2277354) (← links)
- Scheduling a project to maximize its net present value: An integer programming approach (Q2366079) (← links)
- Early-tardy cost trade-offs in resource constrained projects with cash flows: An optimization-guided heuristic approach (Q2366088) (← links)
- Hierarchical models for multi-project planning and scheduling (Q2366089) (← links)
- Tabu search and simulated annealing for resource-constrained multi-project scheduling to minimize maximal cash flow gap (Q2666666) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)
- Resource-constrained project scheduling by simulated annealing (Q4230228) (← links)
- A constraint-based perspective in resource constrained project scheduling (Q4394226) (← links)
- An integer linear programming model and a modified branch and bound algorithm for the project material requirements planning problem (Q4469137) (← links)